Skip to content
Industrial coating production hall with yellow vessels, a conveyor line and a robotic arm

Epoxy floor materials

Floor coatings specified as one system

Primers, build coats, self-leveling layers and topcoats chosen together, so the floor works as a single build-up.

Technical data

Read the build-up, not just the product name

Every model page shows where the product sits in the floor system, with specification rows and a gallery you can check against your own project.

  • Technical data sheet

    Model-level performance and handling data, issued on request.

  • System build-up

    The layer sequence for your floor, with each model referenced.

  • Application guidance

    Preparation and application notes for your contractor.

  • Inspection points

    What to check at substrate, intermediate and finish stages.

Example: where a primer sits

  1. Topcoat

    Colour, finish and zone marking

  2. Self-leveling layer

    Smooth, continuous surface

  3. Build / mid coat

    Film build and load carrying

  4. Primer & sealer

    Bond and seal to substrate

  5. Prepared concrete substrate

    Ground, cleaned and repaired before coating

Layer numbers run from the substrate upward. Each model page highlights its own position.

Engineering support

Support that follows the floor, step by step

Materials come with a clear route from the first conversation to inspection. Use as much or as little of it as your project needs.

  1. 01

    Consultation

    We review the area, the use and the finish you want before any product is named.

    You share: drawings or photos, area use, traffic type.

  2. 02

    System design

    Primer, build, level and finish layers are combined into one build-up for the floor.

    You receive: a proposed layer sequence with model references.

  3. 03

    Substrate preparation

    Guidance on grinding, repair, crack and joint treatment, and cleaning before the first coat.

    You share: slab age, condition, moisture history if known.

  4. 04

    Floor-coating construction

    Application support for contractors and project teams working from the agreed system.

    You share: programme, access and working-hour limits.

  5. 05

    Inspection

    Checks against the agreed system and finish, with points to review at each stage.

    You receive: inspection points for the stage in question.

Drums, pails, bags and sample trays of floor-coating materials in a storage hall

Representative supply formats

Company

Who you will be dealing with

GUOFAN is the brand of a coating-materials company that supplies epoxy floor systems and supports the people who specify and apply them.

Registered name
Hunan Guofan Environmental Protection New Material Co., Ltd.
Brand
GUOFAN / Guo Fan Coating
Product range
19 listed models in 6 functional groups
Service scope
Consultation, system design, substrate preparation, floor-coating construction, inspection
Inquiries
info@guofanflooring.com

Parking solutions

Parking floors planned zone by zone

The GF-61 to GF-66 range is organised around how a parking floor is actually laid out. Name the zones and we match the models.

  • Parking bays

    Marked bays with clear line edges.

  • Driving lanes

    Circulation routes under vehicle traffic.

  • Ramps and transitions

    Slope changes and level transitions.

  • Entry and exit

    Thresholds, gates and wear points.

Crew rolling a yellow safety stripe onto a glossy dark industrial floor

Before you inquire

Questions buyers ask first

Short answers on selection, pricing and support. Anything else, write to us.

Request for quotation

Tell us the floor. We will propose the system.

Start from your application, and the inquiry opens with it already filled in. Add the product model if you have one.

Have this ready

  • Application and floor area use
  • Approximate area or quantity (optional)
  • Substrate type and condition
  • Traffic, equipment and exposure
  • Colour and finish expectations
  • Product model or system, if already known

Start from your application